TRAINING PROGRAMME ON SURVEY, DESIGN AND CONSTRUCTION SUPERVISION OF MOTORABLE BRIDGE started on 2081/05/16. 25 Officers (Engineers) of Department of Local Infrastructure are participating in the 12 days long training.
TRAINING PROGRAMME ON SURVEY, DESIGN AND CONSTRUCTION SUPERVISION OF MOTORABLE BRIDGE started on 2081/05/16. 25 Officers (Engineers) of Department of Local Infrastructure are participating in the 12 days long training.